Bathroom Installation Week
Duration: 5 days
Bathroom Installation Week
All you need to know to install an entire bathroom, run as a week-long course.
Duration: 5 days.
Price: £495 per person.
The course includes:
- Plumbing:
- To plumb a new bathroom from existing pipe work.
- Plumb in a WC, basin, bath and separate shower.
- Running pipe work to regulations.
- Structural timber considerations when running pipes and cables.
- Running copper and plastic pipe work for the hot and cold supplies.
- Running waste pipes and traps.
- Soil stack connection.
- Radiator/towel rail installation.
- Plastic or steel baths?
- Building:
- Build non-structural, timber stud wall, insulate, plasterboard fix.
- Floor tiling on timber floor i.e. joists – how to build the floor correctly, where you can’t tile.
- Shower area wall types – different cost effective options.
- Tiling:
- Basic tiling – wall and floor tiles.
- Cutting straight lines and holes.
- Manual and machine cutting.
- Setting out and preparation.
- Laying tile on floor and wall and grouting.
- Electrical:
- Zoning of electrical appliances.
- Ventilation.
- Testing sockets are safe, testing wires are live.
- Standards:
- Joist cutting for pipes and cables – what you cannot do – yes there is a spec on this.
- Water regulations.
- Electrical work – 17th edition specification – walk through.
- Building regulations – what they are and relevance.
- Power tools – Demo and use of the following: compound/mitre saw, jigsaw, SDS 240V drill, battery drills, circular saw, spirit level, 90 degree squares.
- Materials:
- Save money on materials – where to buy plumbing parts.
Location: | Date: | Book: | ||||||
Farnham | Run on demand | |||||||